Artarmon
ShoreHire was called in to supply Trishore props for back propping this new industrial construction site.
The tramway for the crane as well as the outriggers required back propping. Each
Trishore required hardwood sleepers to spread the loads over the slabs.
Our experienced staff worked with the site engineer to ensure that the required loads were met.
Other Projects