Our services were called upon to support the load a duplicate bridge being erected in Canberra. Unfortunately there had been an accident on site prior to our involvement, so it was imperative that our Shore 100 and Shore 1000 high load props were able to support the load of the concrete being poured during the construction process. The job was completed with no hassle and the customer what ecstatic with the ease in which our gear went together, saving them time and money in the formwork construction process.