Mount Gravitt

The Situation

We were called to assist the contractor who was laying stormwater at a Westfield shopping centre that was being upgraded. During construction Steel Plate trench coverings were required.

 

The Solution

Shore Hire was able to supply the contractor 25mm thick steel road plates to cover the open excavation each evening and allow traffic and pedestrian access across the trenches

 

The Result

The contractor was able to keep the loading dock operational and the main entry open for the shopping centre by utilising Shore Hire's Steel Plates

Roseville
Roseville

With the current upgrade to the Sydney rail network our Engineering division was employed to assist in delivering a solution to support an abutme

Canberra
Canberra

Shore Hire provided an engineered solution for their hydraulic bracing  system by reviewing geotech reports. The client was supplied with a

Cronulla
Cronulla

Recently Shorehire was called upon to shore several water main pits. Due to the nature of the cross services running through these pits, timber s

St Leonards
St Leonards

During this major reconstruction of Royal North Shore Hospital Shorehire supplied Tri Shore and Shore 1000 heavy duty propping systems to assist