The Pilberra

The Situation

The client was installing a stacker conveyor section at a height of 28m weighing 100 tonne using a 500 tonne crane and we were asked to supply a engineered structural tower to support the conveyor prior to the connection of the permanent structural cable  ties

 

The Solution

Shore Hire provided detailed engineered design drawings, custom structural steel beam clamps, an onsite engineer to run the project, a rigging crew to build the structural tower and engineering certification of the project.

 

The Result

By utilising Shore Hire's engineering services and structural system the client was able to install the conveyor accurately and safely at a height of 25 meters and continue with the commissioning of their 3.5 kilometre Conyers system on program

Roseville
Roseville

With the current upgrade to the Sydney rail network our Engineering division was employed to assist in delivering a solution to support an abutme

Canberra
Canberra

Shore Hire provided an engineered solution for their hydraulic bracing  system by reviewing geotech reports. The client was supplied with a

Cronulla
Cronulla

Recently Shorehire was called upon to shore several water main pits. Due to the nature of the cross services running through these pits, timber s

St Leonards
St Leonards

During this major reconstruction of Royal North Shore Hospital Shorehire supplied Tri Shore and Shore 1000 heavy duty propping systems to assist