Ultimo
|
|
During the construction of this building at Ultimo a heavy load bearing structure needed to be constructed to support pre cast floor panels, while the building was under construction and until such time that the new building works would take the load of the precast floor panels. This structure consisted of many different Shorehire products.
Which was all designed by a qualified Structural Engineer Consultant working with Shorehire. |