Sydney CBD

The Situation

A multi-storey construction project in the Sydney CBD required back propping of multiple floors during construction, with extended ceiling heights presenting various propping challenges. 

 

The Solution

Shore Hire supplied and installed a series of multi props on each floor. Multi props fitted the bill for this project – they are lightweight, transportable, easy to assemble, with high-load-bearing capacity and the ability to extend up to 6.25m, easily accounting for the feature ceiling levels in this project. With cheaper steel tube alternatives not up to scratch, Shore Hire’s solution exceeded the customer’s requirements. 

 

The Result

Shore Hire’s multi prop solution ensured the back propping installation was completed efficiently. With multiple props required to be grouped together to meet load-bearing requirements, their portability and ease of assembly became important assets on this project and ensured a timely installation. 

Roseville

With the current upgrade to the Sydney rail network our Engineering division was employed to assist in delivering a solution to support an abutme

Canberra

Shore Hire provided an engineered solution for their hydraulic bracing  system by reviewing geotech reports. The client was supplied with a

Cronulla

Recently Shorehire was called upon to shore several water main pits. Due to the nature of the cross services running through these pits, timber s

St Leonards

During this major reconstruction of Royal North Shore Hospital Shorehire supplied Tri Shore and Shore 1000 heavy duty propping systems to assist